Multi Logo Graphic

Setup: Checking Components

After Setup starts, it verifies that each required software component is installed, if a required software component is not installed, Setup automatically installs it. This process could take from several seconds to 20 minutes or more depending on which software components need to be installed and the speed of your computer. While verifying and installing required software components, Setup displays a dialog similar to the following:

Checking Components graphic

Multi-Objective-OPT has been developed by OPTIMUM Power Technology. For more information, contact:
500 Millers Run Road  •  P.O. Box 509   •  Morgan, PA 15064   •  Phone: 412-257-9070   •  Fax: 412-257-9011   •  sales@optimum-power.com